Payment Type: T/T
Transportation: Ocean,Land
Model | |
Contact Now |
Brand: YOUNENGDE
Place Of Origin: China
Status: New
Types Of: Arc Furnace
Use: Melting Furnace
Video Factory Inspection: Provided
Mechanical Test Report: Provided
Core Component Warranty Period: 1 Year
Core Components: Plc
Warranty Period: 1 Year
Out-of-warranty Service: Video Technical Support, Online Support, Spare Parts, Field Maintenance And Repair Service
Core Selling Point: Energy Saving
Where To Provide Local Services (in Which Countries Are There Overseas Service Outlets): None
Applicable Industry: Energy &Amp; Mining, Manufacturing Plant
Showroom Location (in Which Countries Are There Sample Rooms Overseas): None
Selling Units | : | Set/Sets |
---|---|---|
Package Type | : | Steel Case/ Wooden Case |
The file is encrypted. Please fill in the following information to continue accessing it
Double Electrode Dc Electric Arc Furnace
100~20000kVA
This DC Electric Arc Furnace can smelt various types of scrap iron, scrap steel, iron filings, scrap steel, and scrap iron. Automated control, easy to operate.
A small double electrode DC Electric Arc Furnace is a device used for melting metals. It consists of two electrodes and heats the metal material to its melting point through a DC arc, thereby achieving the melting process.
Small double electrode DC Electric Arc Furnaces typically consist of the following components:
1. Furnace body: The furnace body is a space that accommodates metal materials and arcs. It is usually made of high-temperature resistant materials, such as fire-resistant bricks or ceramic materials.
2. Electrode: The electrode is the part that transmits an arc through current. They are usually made of conductive materials. The electrodes are usually located at the top of the furnace body, and the strength and stability of the arc can be controlled by adjusting the electrode spacing.
3. Power system: The power system provides the required DC current to maintain the stable operation of the arc. It usually consists of power equipment and control systems, which can adjust the intensity and frequency of the current.
4. Cooling system: The cooling system is used to cool the electrodes and power supply to prevent overheating and damage. It usually includes a water cooling device or a fan.
The small double electrode DC Arc Furnace has the following advantages:
1. High efficiency: DC arc furnace can provide high temperature and high energy density, making the smelting process more efficient.
2. Accurate control: By adjusting the current and electrode spacing, the temperature and melting rate inside the furnace can be precisely controlled.
3. Flexibility: Small dual electrode DC arc furnaces can adapt to the melting needs of different types and sizes of metal materials.
4. Environmental protection: Compared to traditional combustion furnaces, DC arc furnaces produce less exhaust gas and waste residue, and have a smaller impact on the environment.
Small double electrode DC Electric Arc Furnaces are widely used in laboratories, factories, and the metal processing industry for melting and casting various metal materials, such as iron, steel, copper, aluminum, etc.
Green and energy-saving, stable and reliable
Equipment characteristics
1.The power consumption is 10%~15% less than that of AC furnace.
2.The consumption of graphite electrode is 40% less than that of AC furnace.
3.Compared with AC furnace, it eliminates the investment of reactive power compensation device.
4.The noise level is 10~20 dB lower than AC furnace.
5.In the smelting process, metal ions in the melt will be concentrated around the negative electrode due to electrolysis, so as to improve the yield and purity of products, which is more conducive to the enrichment of precious metals and other high-value metals.
6.The current direction and electromagnetic field direction of DC furnace remain unchanged. Driven by the magnetic field, the molten slurry circulates in one direction all the time, forming electromagnetic stirring, so that the material melts without dead corners, the product quality is high, and the yield is high.
7.When an accident occurs in the smelting process and a power failure occurs for a period of time, an insulating hard shell will be formed on the surface of the molten liquid.
Facing this situation, the double electrode DC furnace can start arc smelting again by adding arc striking materials such as coke at the bottom of the electrode.
Packaging: Steel Case/ Wooden Case
Transportation: Ocean,Land
Place of Origin: CHINA
HS Code: 8514390010
Port: Qingdao,Rizhao
Payment Type: T/T
Incoterm: FOB,EXW
Hot Products
SEND INQUIRY